Total Pageviews

Wednesday, 19 March 2008

Progression


Hopefully you can make out in the photo above that some more track and sleepers have been laid. The three points on the first board are now glued down and a fair amount of track laid around them.

Here's the first photo of stock on my layout! There's a NWNGR coal wagon and brake van along with an FR 3 ton slate wagon n the first 14" siding. The WD Ambulance van is on the siding at the end of the loop and the NWNGR workmans' coach is just on the crossing from the loop onto the main towards Beddgelert.

The underneath of the layout is already covered in spaghetti so I thought it was high time to actually complete the wiring diagram for this board and try to cut down on the wiring looms as much as possible. As you can see thre's quite a bit already and this doesn't include the point motor circuits or electromagnets. I did think about getting away from a load of this by going DCC, with the real aim of realisitc slow speed running. However the more I looked at decoders and my stable the more I realised that only locos the size of Russell or above would really be able to accomodate them so it's been put on hold. If anyone's got any other info, experience or cunning ideas then I'm more than open to suggestions.

Friday, 7 March 2008

PW under way

Although this week has seen a lot of experimentation I have actually made some progress. With the siding point laid the sleepers were glued in place for both that siding and the other one. Rails were then soldered in place on the top siding. After a bit of fiddling I've found that a small coping saw cut in the rail only causes a small bump from the stock. As a result the rails have been cut into at the top to represent the 30ft rails being used, matching the sleeper spacings. This looks great at the minute but I wonder if I'm being too pedantic and it'll disappear when it's ballasted/plastered in. That said the rail breaks are great for insulation gaps. Later I'll gently rub off the copper to insulate the two rails and add mock fishplates to the joints. A great advantage of laying onto glued sleepers is that I don't nee to use fishplates to join the rails. Each sector is powered by wires soldered to the bottom of the rail and run down through the baseboard.

The experimentation has revolved around couplings and uncoupling. To lay the track I needed to finalise the uncoupling magnets. So to test and work out how high to place the Greenwich permanent magnets and SEEP electromagnets I had to make up some couplings. For those to work I had to devise my way of mounting the couplings at the right height to the stock. I copied someone's idea of pinning the couplings to a balsa block at the right height and, after a load of work, decided this was weak and awkward. The best idea I had at the end was to place a blob of Blu Tac against the coupling height gauge, stick the coupling gauge in it and then offer up the wagon; much better!

So now I have some wagons with couplings, knowledge on how to place the magnets and therefore was able to place the magnets and lay the track. All in all a lot of work to lay a 14" siding but work that needed to be done! The baseboard frame is also making good progress which is fortunate a I don't want to lay much more track until the board and frame are as one.

Sunday, 24 February 2008

Motors and Locos



This photo shows the outcome of my efforts at building a circuit. Modratec use SPST switches and they showed a circuit using an Op Amp that can power a Tortoise which would usually use a DPDT to switch the current. I don't really understand how it works but it does. A pair of LEDs were used to show which way the point had motored; these will be used to show the route chosen on the control panel for the layout.


Apart from a Chivers Russell on a slightly dubious Minitrix chassis this is my current loco stable. the Ruston and Hunslet were aquired through Ebay but the Avonside was built by me for a previous layout based on the Penrhyn Quarry Rly. The lining looks better in the photo than in real life! Unfortunately both the Ruston and Avonside are too late for the period I'm modelling but I'm sure they'll still come out for the odd run. I'm a big fan of the Hunslets but this one has two problems; firstly it has massive flanges which become a bit of an issue through some of my points with the increased back-to-back sizings and, secondly, it doesn't have outside frames like the original. I may think about trying to fabricate some and fitting extended flycranks but that's all for a much later day, especially as 0-4-0 Hunslets were not a feature of the NWNGR.
In the mean time I have a Chivers kit for the NWNGR Single Fairlie, Moel Tryfan. This has been bought alonside a new Dapol GWR Prairie chassis which is lovely. Runs increadibly, has fine rods and the chemically darkened metal looks great. Technically it's 2mm short and the drive should be to the rear axle rather than the centre one but I think it'll be ok. Even better is that it has fine flanges and a 7mm back-to-back so I won't have to adjust the wheels on the axles, phew!



Tuesday, 19 February 2008

Points, Signals and Lever frames

Trackwork has progressed but really isn't that interesting. More interesting is the way that my mind has started wandering. I was trying to work out how to arrange the interlocking and control of the points. Doing a bit of research I came across these lever frames from an Australian company called Modratec.


They come as a custom-made kit that you assemble. With a clever bit of software you design the interlocking and functions you want and they provide all the tappets and locks to give you a proper lever frame. I could then use this with the point motors, signals and even facing point locks to operte properly. They're not cheap but, compared with a lever frame from MSE or similar, they become quite reasonable for a load of operability. Even better my dad, as an FR trained signalman, would hopefully help with organising it and getting me to run it properly.

All of this has also led me to look at signals. Assuming Bethania is at the joining of 2 block sections and with the quarry line as well this starts getting a bit complex; incredibly complex compared to the NWNGR who had essentially given up on signals by the 1920s! Oh well, off to research whichever McKenzie and Holland signals they used and try to work out how it would operate.

Friday, 15 February 2008

Progress

Things have now started. The track-plan is now finalised and construction has begun. Colin Lea has rightly pointed out that this would have been an unlikely line in reality but from the point of view of a developed model railway I'm happy enough! It is true that about a mile of the Glaslyn has been compacted into something like 150m to enable the river crossing and entirely fictitious tunnel on the other side. Similarly it has removed the long horseshoe that would have taken the line to the SSSQ's incline rather than the branchline off to it that I have created. Isn't Narrow Gauge modelling great when you can just make stuff up. Hopefully there is a strong hint of reality in it and I shall try to be strict with myself in the future.


The first baseboard fram is now done. 2x1 with 1.5x1 strengtheners. It'll be open frame with a plywood cross section raised 3/4 of an inch above the frames to allow the Glaslyn to run underneath.



Exciting picture, eh? More interesting might be the trackwork. It's all being laid on copperclad strip using Peco Flat Bottomed Code 60 rail (Z gauge normally). To be similar to the original 41lb/yd rail would need to be about code 40 which is prob too small and nard to get hold of. The code 60 is available and relatively low profile. It is also high enough that the flanges won't run on the ballast! So far I've almost completed the point into the top siding and I've started putting together the main line crossover at the Beddgelert end. In another effort to increase realism I've moved the checkrails closer to the stock rails. It looks better but now I'll be pushing all my wheels out to give a 7.5mm back to back gauge. Almost to scale! Another advantage is using XTrkCAD I can produce templates for the turnouts involving odd curves and build them accurately away from the layout much like settrack. The tie bars are inverted copper clad strip with brass track pins pushed through from below and the blades soldered to them, as recommended in the 009 handbook. Plan is to use tortoise type motors to drive them and I'll aim to interlink the motors to give some form of interlocking.


Tuesday, 5 February 2008

Watkin Path/Khyber Pass

Further up the mountain the Watkin Path climbs alongside the South Snowdon Slate Quarries' inclines. Although this isn't going to be modelled I coudn't resist putting it in. For those that don't know this bit of the path was used as the Khyber Pass in Carry On Up The Khyber. So here's a piccie!



Monday, 14 January 2008

The start

Well this is it. I'm starting a layout and a blog at the same time. I know a bit about railways but not so much about computer trickery so it could be interesting to see where this goes.

The layout is set in Bethania, a real hamlet alongside the Afon Glaslyn up the valley from Beddgelert in an area known as Nant Gwynant. Today it has a chapel that's been converted into a tea shop, a bunkhouse, a few cottages and a car park as it sits at the start of the Watkin Path up Snowdon.

At the end of the 19th century the North Wales Narrow Gauge Rlys gained the rights to build a rly from Porthmadog to Betws Y Coed through Nant Gwynant and Capel Curig. Bethania assumes that this line was built and a success and Bethania had a private line to the South Snowdon Slate Quarries. Sitting at the foot of the Watkin Path up Snowdon it will also have a small tourist appeal. At the minute I'm not sure whether to set it around 1910 (clean-ish locos and stock) or in the early 1920s assuming there has been a resurgance in slate and tourist traffic (clean-ish locos and stock and some ex-WD stock).




The track diagram gives an idea of roughly how it will look. The masterplan is to be as accurate to history as I can. The chapel and terrace will be modelled, NWNGR locos and stock will be used in NWNGR livery. This will be a bit of a challenge as it was influenced so much by the Portmadoc Beddgelert and South Snowdon Rly and later the Welsh Highland Railway, none of which would have existed had the NWNGR been a commercial success. That said Russell will be an allowed compromise, as will the assumption that a link was built between Beddgelert and Rhyd Ddu.

Hopefully more to follow!